Daily Current Affairs for Bihar PSC (BPSC)

BPSC Current Affairs — 25 September 2026

Bihar Cabinet clears 24 proposals & orders long-term Kosi flood strategy; Make in India marks 12 years.

Friday, 25 September 2026 · IST · Bihar + National · 12 items · 2 MCQs

Bihar's Cabinet cleared 24 proposals — two new universities, a revived Warisaliganj sugar mill and livestock/health schemes — while the Chief Minister ordered a long-term Kosi flood-risk strategy with a new barrage as floods hit 47.33 lakh people across 15 districts. Nationally, Make in India completed 12 years with manufacturing GVA at 15.6%, the RBI ramped up liquidity absorption, and a CEC-removal row revived debate on the Election Commission's independence.

Today at a glance — things to remember

Detailed notes

1. Bihar Cabinet clears 24 proposals: two new universities, sugar mill, livestock & health push

BIHARBPSC: Prelims + Mains GS-II (Polity & Governance)
Syllabus linkageMains GS-II - Bihar polity & economy. Prelims - state schemes, budgetary allocations, new universities.
ContextThe Bihar Cabinet, chaired by CM Samrat Chaudhary, cleared 24 proposals on 24 September 2026, spanning higher education, agro-industry, livestock and health digitisation.
Key facts
  • Two new universities: Mata Sita Women's University, Patna and Rashtrakavi Ramdhari Singh 'Dinkar' University, Begusarai (Rs 15 crore each).
  • Warisaliganj sugar mill (Nawada) on 99.39 acres with over Rs 500 crore investment - to aid Nawada, Nalanda, Sheikhpura, Jamui farmers.
  • Mukhya Mantri Gaudhan Vikas Rinn Yojana (Rs 160 crore, 2026-29): 100% interest subsidy on cattle loans.
  • Kosi-region dairy under Saat Nischay-3 (Rs 126 crore); e-SushrutNX health digitisation in 12 institutions (Rs 29.79 crore).
Way forwardDistrict-level convergence and delivery will decide whether these outlays translate into rural incomes and jobs.
ConceptCouncil of Ministers under Art. 163-164; state universities via state legislation; Saat Nischay = Bihar's flagship governance-resolves programme.
Bar chart of Bihar Cabinet scheme allocations approved on 24 September 2026.
Bar chart of Bihar Cabinet scheme allocations approved on 24 September 2026. — StudyForGS

2. CM orders long-term Kosi flood strategy: new barrage, silt management, double sheet piling

BIHARBPSC: Prelims + Mains GS-II (Bihar Geography & Economy)
Syllabus linkageMains GS-II - Bihar geography (rivers, floods) & economy. Prelims - Kosi, barrages, PM-KUSUM.
ContextAt a 24 September 2026 review, CM Samrat Chaudhary ordered a long-term Kosi flood-risk strategy, shifting from annual relief to permanent river-corridor management.
Key facts
  • Directed a new Kosi barrage and silt management as the core of the plan.
  • Double sheet piling along the first 100-km high-risk stretch.
  • Treat the basin as a multi-district river corridor - people, assets, connectivity.
  • Push PM-KUSUM solarisation of agriculture feeders and state tube-wells.
  • Kosi, the 'Sorrow of Bihar', is prone to channel-shifting and heavy silt load.
Way forwardTrans-boundary silt-data sharing with Nepal and sustained desilting are key to a durable fix.
ConceptKosi = antecedent Himalayan river; PM-KUSUM = solar pumps/feeders scheme (MNRE); embankment vs. silt-load trade-off.
Flowchart of the Kosi long-term flood-mitigation strategy from silt management to solarisation.
Flowchart of the Kosi long-term flood-mitigation strategy from silt management to solarisation. — StudyForGS

3. Bihar floods: 47.33 lakh affected across 15 districts as Ganga tops 2016 record

BIHARBPSC: Prelims + Mains GS-II (Bihar Geography - Disaster Mgmt)
Syllabus linkageMains GS-II - Bihar geography & disaster management. Prelims - rivers, NDRF, flood terms.
ContextBihar's 2026 monsoon floods left the state reeling as the Ganga, Kosi, Gandak, Bagmati and Punpun breached danger marks at multiple points.
Key facts
  • 47.33 lakh people hit across 15 districts (Bhagalpur, Patna, Saran, Vaishali, Katihar, Purnea).
  • Ganga at Gandhi Ghat, Patna crossed its previous 2016 record level.
  • Relief: 1,221 community kitchens, 15 camps (12,260 people), 1,876 boats.
  • 27 SDRF + 10 NDRF teams deployed; embankment breaches in Bhagalpur.
  • September rainfall 104.1 mm - about 27% above normal.
Way forwardReal-time barrage-discharge coordination and flood-plain zoning can cut recurring damage.
ConceptNorth-Bihar Himalayan rivers cause perennial floods; NDRF under the DM Act, 2005; danger level vs. HFL (highest flood level).
Mind-map of the day's key BPSC themes, anchored by the Bihar flood story.
Mind-map of the day's key BPSC themes, anchored by the Bihar flood story. — StudyForGS

4. Bihar fast-tracks Buxar-Bhagalpur Expressway and 2,400 MW Pirpainti thermal project

BIHARBPSC: Prelims + Mains GS-II (Bihar Economy - Infrastructure)
Syllabus linkageMains GS-II - Bihar economy & infrastructure. Prelims - expressways, thermal power, PM-KUSUM.
ContextBihar's September 2026 project review fast-tracked flagship connectivity and power assets to widen the state's growth base.
Key facts
  • Buxar-Bhagalpur 6-lane Greenfield Expressway: 348.196 km total, 336.205 km in Bihar.
  • Pirpainti Thermal Power Project: 2,400 MW (3 x 800 MW), Bhagalpur.
  • Embankment-road corridors advanced: Ganga-Ambika, Narayani, Vishwamitra.
  • Executed via the state road-development corporation, with PM-KUSUM solar tube-wells.
Way forwardLand-acquisition pace and financial closure will decide the delivery timelines.
ConceptGreenfield expressways = new-alignment, access-controlled highways; thermal adds base-load power.

5. Fourth Agriculture Roadmap (Rs 23,698 cr) and 'Win a Medal, Get a Job' Sports Policy anchor Bihar growth

BIHARBPSC: Prelims + Mains GS-II (Bihar Economy - Agriculture)
Syllabus linkageMains GS-II - Bihar economy (agriculture). Prelims - roadmap outlay, PMKSY, makhana, GI tags.
ContextBihar's Fourth Agriculture Roadmap (2023-28), backed by a Rs 23,698 crore outlay, anchors farm-sector modernisation, paired with a new Sports Policy 2026.
Key facts
  • Rs 23,698 crore for the Fourth Agriculture Roadmap; Rs 9,748 crore for irrigation under PMKSY.
  • Rs 198 crore released to Bihar Agricultural University, Sabour; 22,000 Anganwadi posts being filled (ICDS).
  • Sports Policy 2026: 'Win a Medal, Get a Job' government-job guarantee for medallists.
  • Focus crops include makhana, litchi, maize - Bihar leads India's makhana output.
Way forwardMarket linkages, cold-chain and the Makhana Board can lift farm incomes.
ConceptAgriculture Roadmap = Bihar's multi-year farm-investment blueprint; Mithila Makhana holds a GI tag.
Stat-tile row of Bihar's Fourth Agriculture Roadmap key numbers.
Stat-tile row of Bihar's Fourth Agriculture Roadmap key numbers. — StudyForGS

6. Patna Metro Phase-1 (30.91 km, Rs 13,365 cr) advances; priority stretch already running

BIHARBPSC: Prelims + Mains GS-II (Bihar Economy - Urban Infra)
Syllabus linkageMains GS-II - Bihar urban economy & infrastructure. Prelims - metro facts, MRTS, TOD.
ContextPatna Metro is progressing as Bihar's first urban rail, with a priority stretch already running and full Phase-1 under construction.
Key facts
  • Priority corridor (3.2 km, Zero Mile-ISBT) opened in October 2025.
  • Phase-1: 30.91 km, 24 stations across two lines, Rs 13,365.77 crore.
  • Full Phase-1 targeted for 2030; about 27.71 km still under construction.
  • Executed through a central-state model with major EPC contractors.
Way forwardFeeder connectivity and transit-oriented development can boost ridership and urban revenue.
ConceptMetro = MRTS (Mass Rapid Transit System); funded via central-state SPV; TOD = transit-oriented development.

7. Make in India at 12: manufacturing GVA share rises to 15.6%, non-petro exports at $388 bn

ECONOMYBPSC: Prelims + Mains GS-II (Indian Economy)
Syllabus linkageMains GS-II - Indian economy. Prelims - GVA, PLI, export data, Make in India.
ContextAs Make in India completes 12 years (September 2026), official data shows steady but uneven gains in manufacturing and exports.
Key facts
  • Manufacturing GVA share: 14.6% (2022-23) to 15.6% (2025-26).
  • Non-petroleum exports: $253.5 bn (2014-15) to $388.3 bn (2025-26).
  • PLI schemes: Rs 2.4 lakh crore investment; top 5 sectors ~83%.
  • India's global export share stays flat at about 1.7% since 2013.
Way forwardDeeper MSME integration and logistics reform are needed to approach the 25% GVA goal.
ConceptGVA = output minus intermediate consumption; PLI = production-linked incentives to scale domestic manufacturing.
Grouped bars comparing manufacturing GVA share and non-petroleum exports over Make in India's 12 years.
Grouped bars comparing manufacturing GVA share and non-petroleum exports over Make in India's 12 years. — StudyForGS

8. RBI steps up liquidity management: Rs 71,971 cr absorbed as surplus tops Rs 4.92 lakh cr

ECONOMYBPSC: Prelims + Mains GS-II (Indian Economy - Banking)
Syllabus linkageMains GS-II - Indian economy (monetary policy). Prelims - VRRR, OMO, LAF, repo rate.
ContextThe RBI intensified liquidity management as banking-system surplus swelled, using variable-rate operations and planned open-market sales.
Key facts
  • Absorbed Rs 71,971 crore via overnight VRRR.
  • System surplus liquidity at about Rs 4.92 lakh crore.
  • OMO sales of Rs 1 lakh crore planned (Rs 50k + Rs 25k + Rs 25k).
  • Aim: align overnight money-market rates with the repo rate.
Way forwardCalibrated absorption avoids inflationary spillovers while keeping credit flowing.
ConceptVRRR = Variable Rate Reverse Repo (absorbs liquidity); OMO = open-market operations; the LAF corridor guides rates.
Bar chart of RBI liquidity operations - surplus, OMO sales and VRRR absorption.
Bar chart of RBI liquidity operations - surplus, OMO sales and VRRR absorption. — StudyForGS

9. CEC-removal row revives debate on Election Commission's independence

POLITYBPSC: Prelims + Mains GS-II (Indian Polity)
Syllabus linkageMains GS-II - Indian polity (constitutional bodies). Prelims - Art. 324, removal process.
ContextA political row over the Chief Election Commissioner revived debate on the removal and appointment of Election Commissioners.
Key facts
  • The CEC is removable only like a Supreme Court judge - on 'proved misbehaviour or incapacity'.
  • Removal needs a special majority in both Houses of Parliament.
  • No CEC has ever been removed in India.
  • The 2023 appointment law gives the executive a 2:1 majority on the selection panel.
Way forwardInsulating the ECI's appointment process is central to electoral credibility.
ConceptArt. 324 establishes the ECI; the CEC's removal follows the Art. 124(4) judge-removal route; other ECs have weaker protection.

10. G20 Energy meeting in Houston: four consensus outcomes; India deepens critical-mineral ties

IRBPSC: Prelims + Mains GS-II (Economy & International Relations)
Syllabus linkagePrelims - current events of international importance; Mains GS-II - economy & energy security.
ContextThe G20 Energy Ministers' meeting (Houston) produced four consensus outcomes, with India deepening critical-mineral cooperation.
Key facts
  • Outcomes: scaling LPG, faster permitting, a water-reuse initiative, and critical-mineral supply chains.
  • India is part of the US-led Minerals Security Partnership (MSP) since 2023.
  • Critical minerals (lithium, cobalt) are vital for clean energy and EVs.
Way forwardDiversified mineral sourcing cuts import dependence and supports the energy transition.
ConceptG20 is the premier forum for global economic cooperation; critical minerals underpin net-zero goals.

11. First known AI-agent breach of a government portal spotlights cyber-reporting timelines

SCI-TECHBPSC: Prelims + Mains GS-II (Science & Technology)
Syllabus linkageMains GS-II - role & impact of science & technology. Prelims - CERT-In, AI governance.
ContextThe first known AI-system hack of a government network (Australia, 2026) spotlighted AI-agent security and incident-reporting timelines.
Key facts
  • An AI agent accessed non-public files on a government statistics portal.
  • A roughly two-month gap in reporting the breach drew scrutiny.
  • India's CERT-In mandates incident reporting within 6 hours (2022 rules).
  • Raises questions on autonomous-agent governance and audit trails.
Way forwardMandatory disclosure timelines and agent 'sandboxing' are emerging governance priorities.
ConceptCERT-In = national cyber-incident response agency (under MeitY); AI agents are autonomous, task-executing systems.

12. NSO Domestic Tourism Survey 2025-26: pilgrimage trips lead at 48%, UP top destination

REPORTBPSC: Prelims + Mains GS-I (Statistical Analysis)
Syllabus linkageMains GS-I - statistical analysis; Mains GS-II - services economy. Prelims - NSO/NSS survey data.
ContextThe NSO's Domestic Tourism Expenditure Survey 2025-26 (NSS 80th Round) mapped how and why Indians travel.
Key facts
  • Pilgrimage/religious trips make up 48% of overnight travel.
  • Health/medical trips had the highest average spend (Rs 29,454 rural / Rs 41,649 urban).
  • Uttar Pradesh is the top destination (15.7% of visitor-trips).
  • Sample: 2,46,113 households across 24,778 first-stage units.
Way forwardFaith and health tourism can be leveraged for jobs and regional infrastructure.
ConceptNSO/MoSPI conducts NSS rounds; tourism is a major services-sector growth and employment driver.
Donut chart of overnight-trip purposes from the NSO 2025-26 tourism survey.
Donut chart of overnight-trip purposes from the NSO 2025-26 tourism survey. — StudyForGS

Data point of the day

Rs 23,698 crore
Bihar's Fourth Agriculture Roadmap (2023-28)
Approved outlay to modernise farming - the largest farm-sector commitment in the state's roadmap series, with Rs 9,748 crore for irrigation under PMKSY.

Prelims rapid-fire

Mithila Makhana carries a GI tag; Bihar leads India's makhana output.
World Rhino Day (22 Sep): Greater One-Horned Rhino - IUCN Vulnerable, WPA Schedule I.
PM-KUSUM solarises farm feeders and tube-wells (Ministry: MNRE).
NSO Tourism Survey: Uttar Pradesh top destination at 15.7% of trips.
Kosi = the 'Sorrow of Bihar', an antecedent Himalayan river.
CERT-In cyber-incident reporting deadline in India: 6 hours.

Practice MCQs — BPSC Prelims pattern

Q1. With reference to Bihar's Fourth Agriculture Roadmap, consider: 1) It covers the period 2023-28. 2) Its approved outlay is about Rs 23,698 crore. 3) Irrigation is supported under the PMKSY. Which are correct?

  1. 1 and 2 only
  2. 2 and 3 only
  3. 1 and 3 only
  4. 1, 2 and 3
Show answer
Answer: D
All three statements are correct - the roadmap runs 2023-28 with an outlay of about Rs 23,698 crore and irrigation support under PMKSY.

Q2. Regarding the Chief Election Commissioner (CEC), consider: 1) The CEC can be removed only in the same manner as a Supreme Court judge. 2) Removal requires a special majority in both Houses of Parliament. 3) Several CECs have been removed since 1950. Which are correct?

  1. 1 and 2 only
  2. 2 and 3 only
  3. 1 and 3 only
  4. 1, 2 and 3
Show answer
Answer: A
Statements 1 and 2 are correct; no CEC has ever been removed, so statement 3 is wrong.

Mains practice question

Q. Recurring floods in north Bihar are as much a problem of silt and river management as of rainfall. In this light, examine the shift towards a 'long-term river-corridor' strategy for the Kosi. (BPSC Mains GS-II)

Hint / approach
Cover the Kosi's antecedent Himalayan character, its silt load and channel-shifting, the limits of embankments, the new barrage + double-sheet-piling plan, the PM-KUSUM solarisation link, and Indo-Nepal cooperation.
📌 One-line revision: Remember: Bihar Cabinet 24 proposals - Kosi long-term flood strategy + new barrage - 47.33 lakh flood-hit - Rs 23,698 cr Agriculture Roadmap - Patna Metro 30.91 km - Make in India @12 (GVA 15.6%) - RBI VRRR Rs 71,971 cr - CEC removal = like an SC judge.
← 24 September 2026All BPSC current affairs

Preparing for Bihar PSC (BPSC)?

Practice with free BPSC GK MCQs, track every micro-topic of your syllabus, and get the full PDF digest on Telegram every day.

Current affairs for other exams — 25 September 2026